
Production Handover
A Drawing Revision Must Reach the Workbench, Not Just the Inbox
Control drawing revisions at the point of work by linking the approved version to the job, removing obsolete copies and confirming the change with operators.

Control drawing revisions at the point of work by linking the approved version to the job, removing obsolete copies and confirming the change with operators.

Understand a plain go/no-go gauge as an acceptance check for a specified feature, with limits that differ from a full dimensional measurement.